JOURNAL OF NATURAL RESOURCES ›› 2016, Vol. 31 ›› Issue (7): 1241-1250.doi: 10.11849/zrzyxb.20140913

• Resource Research Method • Previous Articles     Next Articles

Water Resources and Industrial Structure Optimization of Hebei Province Based on Interval Multi-objective Programming

ZHAO Yana, HUANG Xin-xina, WANG Hong-ruia, WANG Xin-lib, XU Xin-yia   

  1. a. College of Water Science, Beijing Normal University, Beijing 100875, China;
    b. College of Mathematics, Beijing Normal University, Beijing 100875, China
  • Received:2014-07-13 Revised:2016-05-16 Online:2016-07-20 Published:2016-07-20
  • Supported by:
    National Natural Science Foundation of China, No.51279006 and 51479003

Abstract: The increasingly sharp contradiction between supply and demand of water resources has become the major constraint that affects the sustainable development and ecological construction in Hebei Province. An interval multi-objective optimization model of industrial structure was set up based on water resource input-output table, and three objective functions and corresponding constraint conditions were determined. The optimization adjustment of water resources and industrial structure was calculated and analyzed. According to related policies, the adjustment programs of industrial structure in Hebei Province were put forward, i.e. expanding farms, forestry, fishery, wood products, nonmetallic mineral products, services, construction and food services, continuing to decrease mining, fabricated metal products, textile and apparel products, paper products, printing and energy supplies, and keeping unchanged of other industries. After the implementation of the adjusted structural programs, the added values of Hebei Provinces are expected to reach at least 5 119.116 3 billion yuan, up to 5 518.170 8 billion yuan, and averagely 5 318.643 6 billion yuan; the total amount of water consumption can be controlled within the range of 151.67×108-176.02×108 t; the quantity of pollutant COD can be controlled within the range of 117.31×104-136.80×104 t. The adjusted industrial structure can meet requirements of the development of Hebei Province.

Key words: Hebei Province, input-output analysis, interval number programming, optimization of industrial structure, the restriction of water resource

CLC Number: 

  • TV213.9